|
News | |
02.12.2014
The Russian President says it is impossible to continue project implementation under present conditions. The same capacity gas pipeline will be constructed constructed instead of “South stream” towards Turkey over the Black sea.
30.11.2014
BT SVAP Participates in development of international normative base of design and construction of submerged pipelines with concrete coatings
25.11.2014
Head of department for RF government agencies relations Vladimir Markov declared that pre-construction activities are being carried out routinely, every day, but it was concluded to shift construction commencement date to December 15 (approximate date).
22.11.2014
SVAP board of directors chairman I.I. Shaporin made a report «Efficient engineering solutions for pipeline protection” at 19-th International conference “TURKMENISTAN OIL AND GAS” held in Ashgabat on November 18-20 2014. This conference, also co-sponsored by SVAP, annually gathers the largest oil and gas projects participants from all parts of the world.
News 311 - 315 of 324 First | Prev. | 61 62 63 64 65 | Next | Last |






