Project experience

Gas pipeline construction of the Kirinskoye GCF

Gas pipeline construction of the Kirinskoye GCF

Implementation: 
2012

Project owner: 
GAZPROM invest Vostok

Contractor: 
Stroygasmontazh

Location: 
The Vazi river crossing. Sakhalin

Length: 
8 000 m

The pipe type used in the project: 
Ø1020х17

Pipe laying with berms trench and pulling
Description:



Back to the list