Project experience | ![]() |

Kamenny Log-Perm field gas pipeline rebuilding
Implementation: |
2020 |
Project owner: |
Lukoil PJS |
Location: |
Perm region |
The pipe type used in the project: |
Ø 720х10 мм |
Description:
A comprehensive solution, based on the ZUB technology, of pipeline protection tasks within the framework of the Project in difficult sections and special laying conditions:
Reducing the risks of pipeline accidents in zones of supernormal proximity to housing (compensatory measure) (ZUB-STU);
Protection of the pipeline when laying the pipeline in difficult soils using the HDD method (ZUB-Composite);
Protection and ballasting of the pipeline during the construction at underwater crossings using the PTR method (ZUB-Ballast).
Technical solutions:
- Pipes 720x10 with protective reinforced concrete coating "ZUB-STU"
- Pipes 720x10 with a protective coating "ZUB-Composite".
- Pipes 720x10 with a protective weighting concrete coating "ZUB-Ballast".