Underwater crossing, the Oka river, sector N 42
Implementation: |
2019 |
Project owner: |
Transneft-TSD, LLC |
Contractor: |
VolgaNeftGasStroy |
Location: |
Orel region |
Length: |
470 m |
The pipe type used in the project: |
Ø 530х12 mm |
Description:
Products: pipes 530 mm with external protection weight concrete coating ZUB of 55 mm thick in a galvanized jacket, protection kit for pipeline weld joints (concrete semi-rings). The use of these products provided reliable protection of the pipeline anticorrosive coating and guaranteed the required ballasting in full compliance with the design solutions. Project implementation period: July-August 2019.