Project experience

Gas pipeline. The Zna river submerged crossing

Gas pipeline. The Zna river submerged crossing

Implementation: 
2006

Project owner: 
GAZPROM

Location: 
the Zna river

THIS PROJECT HAS USED A TUBE OF THE PIPE : 
1020 mm

APPLICABLE COATING: 
The Zna river submerged crossing
Description:

Submerged section of gas pipeline

Back to the list