Project experience

The V.I.Greyfer field development

The V.I.Greyfer field development

Implementation: 
2020

Project owner: 
Lukoil-Nizhnevolzhskneft LLC

Location: 
Caspian Sea

Offshore production pipelines ballasting
Description:


  • Heat-insulated pipes (PPU 50 mm) DN400 mm with a protective weighting concrete coating "ZUB-Ballast" 130 and 65 mm thick, including with bracelet protectors, magnetic markers and end heat-shrinkable PPU insulation plugs.
  • Pipes DN 250 mm with a protective weighting concrete coating "ZUB-Ballast" thickness 45 mm. 

 Ballasting of offshore field pipelines (including heat-insulated ones) within the framework of the project for the development of the V. VI Greifer, including - with preliminary installation of ECP protectors and markers.


Back to the list